項目概況

MMG於2012年9月向Nunavut影響審查委員會(NIRB)及主要權力機構提交Izok Corridor項目建議。

MMG向NIRB指明,其正進行可行性研究,評估旨在改善項目經濟性的替代工程機會。此舉將導致更新項目建議的內容。

有關審查的進一步資料,請參閱Izok Corridor頁面。

Izok Corridor項目建議

Volume 1: Main Document

Section 0       Preface
Section 1       Introduction
Section 2       Preliminary Project Description Part 1
                      Preliminary Project Description Part 2
Section 3       Public Engagement
Section 4       Traditional Knowledge
Section 5       Existing Biophysical Environment
Section 6       Existing Human Environment
Section 7       Potential Project Environmental Effects
Section 8       Potential Project Socio-Economic and Cultural Effects
Section 9       Human Health and Ecological Risk Assessment
Section 10     Cumulative and Transboundary Effects
Section 11     Accidents and Malfunctions
Section 12     Environmental Management System
Section 13     References

Volume 2: Appendices

 Appendix A      A1: Non-Technical Summary (English)
                        A2: Non-Technical Summary (Inuktitut)
                        A3: Non-Technical Summary (Inuinnaqtun)
Appendix B      B1: NIRB Part 1 Form (English, Inuktitut, Inuinnaqtun)
                        B2: Project-Environment Interaction Matrices
                        B3: NIRB Part 2 Form
Appendix C      Representative Site Photos
Appendix D      D1: Part 1 NWB – Type “A” Water Licence Application (Izok Mine, High Lake Mine, Grays Bay Port)
                        D1: Part 2 Minmetals Resources Limited 2011 Annual Report
                        D2: AANDC – Application for Crown Land for the Grays Bay Port
                        D3: KIA – Land Use Permit Application for the Izok Mine Facilities
                        D4: DFO – Application for a Section 35 Fisheries Act Authorization for Izok Lake

您覺得此頁面有用嗎?
有用 沒用 壹般
close
close