Dugald River
Overview
Dugald River is one of the world’s top 10 zinc mine operations, located 65 kilometres north of Cloncurry in Queensland, Australia.
The Dugald River operation is 100% owned by MMG Limited and has a workforce of over 850 employees, producing zinc and lead concentrate. Dugald River is the first underground mine that MMG has taken from pre-feasibility to production, with an estimated mine life of more than 20 years.
Ore is mined underground using diamond drilling techniques, extracted to the surface and treated onsite. The processing plant operates with minimal operational input, supporting safe, efficient and consistent production. Concentrate is trucked and then taken by rail to the Port of Townsville (770km), where containers are unloaded and then shipped overseas.
As part of our commitment to a low-carbon future, in April 2023 the Dugald River Solar Farm began operations, supplying a third of the mine’s power, and reducing emissions by 33%.
Community engagement
Supporting local business is a key priority for the Dugald River mine, with MMG staff participating in key events to boost spending and deliver economic benefits to the local communities. From exploration through to closure, the Company talks with Dugald River communities, governments, and stakeholders to understand their priorities and concerns. MMG operates in accordance with the Dugald River Stakeholder Engagement Plan which determines how the Company communicates, gathers feedback, and responds to issues.
The Dugald River mining operation is an active and trusted community partner. MMG engage openly with community members, Traditional Owners, local groups and councils to understand local priorities and support meaningful outcomes. Through sponsorships, grants and local partnerships, MMG helps strengthen education, wellbeing, cultural connection and community resilience, ensuring lasting value is delivered to the region.
Sustainability
MMG Limited’s Sustainability Reports provide a detailed view of the Environmental, Social, and Governance (ESG) performance in the Dugald River mining operation. These reports reflect MMG’s commitment to responsible mining, global standards and continuous improvement, offering stakeholders clear insights into how the Company creates long-term value while supporting sustainable development.
The safe and responsible management of the Dugald River tailings storage facility is a critical priority and a core component of environmental and social risk management strategies. The facility has a capacity of 13 million cubic metres that will support 25 years of mine production, utilising a natural valley to create a safe and environmentally friendly mining solution.
As part of MMG’s ongoing commitment to a low-carbon future, in April 2023 the Dugald River Solar Farm began operations, supplying a third of the mine’s power and reducing emissions by 33%.
Contacts
Duglad River Mine
Phone: +61 7 4442 0630
Email: dr_dugaldriveradministration@mmg.com
Community Relations enquiries
42B Ramsay St, Cloncurry 4824
Phone: +61 7 4442 0759
Email: dugaldrivercsp@mmg.com
Office hours: Monday, Tuesday and Thursday; 9am – 3pm (subject to change)
Related documents
Public Notification/ Application Notice under Environmental Protection Act 1994
It is advised that MMG Dugald River Pty Ltd has lodged an application for a major amendment to an environmental authority and a PRCP schedule in accordance with the requirements of the Environmental Protection Act 1994. The environmental authority and PRCP schedule being amended are EPML00731213 and P-PRCP-100846032.
-
MMG Dugald River Public Notice EA Application Amendment
-
DETSI EA PRCP Amendment Notice Information Request EPML00731213 MMG Dugald River Pty Ltd
-
Response to IR
-
Application form_Signed
-
MMG_EA Amendment_v3.0_Part1
-
MMG_EA Amendment_v3.0_Part2
-
MMG_EA Amendment_v3.0_Part3
-
MMG_EA Amendment_v3.0_Part4
-
MMG_EA Amendment_v3.0_Part5
-
PRCP_v4.0
Dugald River Wind Farm – Public Notification – Application Notice under Planning Act 2016
It is advised that MMG Dugald River Pty Ltd (MMG) is proposing to develop the Dugald River Wind Farm (the Proposed Development) which comprises the construction and operation of up to 24 x 6 MW Wind Turbine Generators (WTGs) and associated ancillary infrastructure including a potential BESS under application 2510-48813 SDA. Relevant documents for the application are shown below.
-
1. Information Response Cover Letter
-
2. Cover Letter – Attachment B – Information Request Notice
-
3. Cover Letter – Attachment C – DRWF Planning Report
-
Appendix A – Owners Consent
-
Appendix B – Prelodgement Advice
-
Appendix C – Indigenous Land Use Agreement
-
Appendix D – Layout Plan
-
Appendix E – PCVMP
-
Appendix F – PCEMP
-
Appendix G – PRMP
-
Appendix H – DSR
-
Appendix I1 – RPD
-
Appendix I2 – RPD
-
Appendix J – SC16
-
Appendix K – SC23
-
Appendix L – SC27
-
Appendix M1 – Agriculture
-
Appendix M2 – MSES
-
Appendix M3 – Natural hazards
-
Appendix M41 – Infrastructure p1
-
Appendix M42 – infrastructure p2
-
Appendix N – MSESAR
-
Appendix O – PVFMP
-
Appendix P – SWIAR
-
Appendix Q – NHRA
-
Appendix R – RMAR
-
Appendix S – FSS
-
Appendix T – ERG
-
Appendix U – PBMP
-
Appendix V – TIA and PIA
-
Appendix W – OSOM Strategy
-
Appendix X – SIA Report
-
Appendix Y – LVIA
-
Appendix Z – BBMP
-
Appendix AA – NIAR
-
Appendix BB – PTIAR